How to Install and Use Windows Server 2008 240 Days for Free
Windows Server 2008, like Windows Vista and Windows XP SP3, has free-look evaluation period, which more commonly known as “activation grace” period. However, Microsoft is more generous on Windows Server 2008 than Windows Vista, where it allows activation-free evaluation period of 30 days after installation. And, as with Windows Vista, user can ‘rearm’ to extend or reset the activation grace period for another fresh 60 days trial usage for up to 3 times.
So Windows Server 2008 system can run for up to 240 days without requires to activate online or offline via phone. 240 days is almost equal to 8 months of free usage without restriction and limitation, and any edition of Windows Server 2008 may be installed without activation for the maximum evaluation period of 240 days. Note that if you’re using Windows Server 2008 Evaluation DVD package, after installation it’s immediately a 120-day initial evaluation period, which the activation grace period can only be extended or rearmed once in this case.
To enjoy the free activation period in Windows Server 2008, users need to install Windows Server 2008 without activating it. To do so, run the Windows Server 2008 Setup program, but do no enter any product key when prompted to enter a product key for activation. Then, click “No” when asked to confirm your selection. The initial 60-day evaluation period which do not require activation be done starts after installation finished.
How to manually extend the activation grade period on expiring
When the 60-day activation grace period is about to expire and end, run the slmgr.vbs script to reset and extend the evaluation period for another new 60-day trial evaluation period, with everything including programs installed and data intact.
- Open an elevated privilege command prompt.
- Type the slmgr.vbs -rearm, and then press Enter to reset the activation grace period to 60 days.
- Restart the computer.
To check the status or time that is left on current activation grace period or evaluation period, run slmgr.vbs -dli command to display the number of days that are left in the current 60-day evaluation period.
User can also use Task Scheduler to automatically rearm activation grace period on expiry.
Related Articles
- Official Way to Install and Use Windows Vista without Activation for Free for 120 Days
- How to Rearm and Extend Free Usage (Activation Grace Period) of Windows 7 to 120 Days
- Free Windows Server 2008 R2 Evaluation (180 days) Installation ISO and VHD for Hyper-V Official Direct Download Links
- Windows Server 2008 Evaluation Virtual Hard Drive (VHD) Images Free Download (for VS2005 and Hyper-V)
- TimerNuke Crack Free Download to Disable Activation of Windows 7 and Server 2008
- How to Automatically Rearm and Extend Activation Grace Period in Windows Vista and Server 2008
- Workaround Fix to Install Virtual PC Additions on Windows Server 2008 Core
- Download Windows Server 2008 R2 Build 7268 64-bit (x64) VHD Image
- Hack to Install Windows 7, Vista or Server 2008 On Computer or Virtual Machine with Less Than 512 MB RAM Memory
- How to Install Windows Live Wave 3 Beta Programs (include Messenger) on Unsupported x86 and x64 of Windows Server 2003 or 2008










































September 10th, 2008 18:33
[...] All editions of Windows Server 2008 can be installed without activation for up to 240 days. [...]
July 4th, 2008 11:24
your all rong install server 2008 std and then change key to this GXTY4-????????????? look the rest up via altavista.com youl find the rest there it will activate perm for you. tested comp still ran in year 2020
June 9th, 2008 00:17
[...] activation grace period which allows user to install and use the operating system for 120 days and 240 days without product key or product activation completed. The initial grace period given is 30 days and [...]
June 8th, 2008 03:15
[...] All editions of Windows Server 2008 can be installed without activation for up to 240 days. [...]